Quick answer: OSHA: before each work shift. UK: before first use, then at least every 7 days, and after any alteration or event such as high wind. Saudi Aramco: tags last 2 weeks at most, plus a pre-use check each shift.
Side by side
Each value with the document it comes from.
| Requirement | OSHA 1926 Subpart L USA | BS EN 12811-1 · TG20 UK and Europe | Saudi Aramco CSM · GI 8.001 Saudi Aramco sites |
|---|---|---|---|
| How often | Before each work shiftAnd after anything that could affect the structure, such as a storm or an impact. A night shift is a new shift.29 CFR 1926.451(f)(3) | Before first use, then every 7 daysAnd after any alteration or event that could affect safety, such as high wind. The 7-day count restarts after an alteration.Work at Height Regulations 2005 reg. 12; NASC TG20:13 Operational Guide 18.3 | At least every 2 weeksScaffold tags are valid for two weeks at most; re-inspect with the field checklist within each two-week period.GI 8.001 §9.3.2, §9.4.3, §9.8 |
| Who inspects | A competent personSomeone able to spot the hazards and authorised to correct them on the spot.29 CFR 1926.450(b), 1926.451(f)(3) | A competent personThe result is recorded in an inspection report.Work at Height Regulations 2005 reg. 12 | Supervisor; certified Inspector over 6 mOver 6 m the Supervisor hands the signed tag to a certified Inspector, who inspects, signs, dates and inserts it.GI 8.001 (2025) §9.3.3, §9.4 |
| Before use on the day | Covered by the shift inspection29 CFR 1926.451(f)(3) | Proof of the last inspectionScaffolds from another company must come with physical evidence, such as a tag or record, that the last inspection was done.Work at Height Regulations 2005 reg. 12(5) | Pre-use check each shiftBy the immediate supervisor of the workers who will use the scaffold, before first use on each shift.GI 8.001 §9.9 |
| Records | — | Inspection report and handoverLoading bays get their own handover certificate stating the safe working load.NASC TG20:13 Operational Guide 12.1, 12.3 (check TG20:21) | Bi-weekly tracking systemThe erector keeps a register of all active scaffolds: tag colour, type, location and next inspection date.GI 8.001 §5.5.2 |
Summary for learning, checked on 24 October 2026. Values as written in the documents named, as used in the AL-YASSIN question banks. TG20 values are from TG20:13; check TG20:21. Verify against the latest edition and your project's own rules before you use any figure. AL-YASSIN is independent and is not endorsed by OSHA, BSI, NASC or Saudi Aramco. — means the document does not give it as one figure here.
Mistakes we see in our exams
- Skipping the night-shift inspection under OSHA because the day shift already checked it. Each shift is a new inspection.
- Counting 7 days from the first inspection after an alteration. Under UK rules the count restarts after the alteration.
- Using the scaffold the morning after high wind without a fresh inspection.
- On Saudi Aramco sites, letting the scaffold builder do the users' pre-use check: it is the users' own immediate supervisor.
Test yourself, free
More comparisons
Questions
How often does OSHA require scaffold inspections?
Before each work shift and after any occurrence that could affect structural integrity, by a competent person. 29 CFR 1926.451(f)(3). Verify against the current eCFR.
How often must scaffolds be inspected in the UK?
Before first use, at intervals of no more than 7 days, and after any alteration or event liable to jeopardise safety, such as high wind. Work at Height Regulations 2005 reg. 12. Verify against the latest edition.
How long is a Saudi Aramco scaffold tag valid?
Two weeks at most. A documented re-inspection with the field inspection checklist must take place within each two-week period. GI 8.001 §9.3.2, §9.4.3, §9.8. Verify against the latest edition.