Home/Free tools/Scaffold glossary
Scaffold glossary
The words used on a scaffold, in plain English with the Arabic term beside each one, for mixed crews, new starters and anyone reading a scaffold plan.
54words
EN · ARtwo languages
A–Zindex and search
0cost
A
- Adjustable base jackرافعة القاعدة القابلة للضبط
- A screw jack at the foot of a standard, used to level the scaffold on uneven ground.
- Anchor pointنقطة التثبيت
- A point strong enough to hold a falling person, to which a lanyard or lifeline is connected.
B
- Base plateلوح القاعدة
- A steel plate under each standard that spreads its load. It sits on a sole board, not straight on soft ground.
- Bayالباكية (الباي)
- The space between two neighbouring pairs of standards along the scaffold.
- Birdcage scaffoldسقالة القفص
- A grid of standards in both directions carrying one deck, often for work on soffits and ceilings.See also: Inspection checklists
- Braceالشدّاد المائل
- A diagonal tube that stops the scaffold from swaying or distorting: facade braces along the face, ledger braces across the width and plan braces in the horizontal plane.
C
- Cantilever scaffoldالسقالة الكابولية
- A scaffold carried on beams that project from the structure, used where the ground below cannot take it.See also: Inspection checklists
- Competent personالشخص المختص
- Someone with the training, knowledge and experience to do a task, such as inspecting a scaffold, and to recognise its hazards.
- Coupler (fitting)الكلبس (الوصلة)
- A fitting that joins two tubes. Right-angle (double) couplers join tubes at 90°, swivel couplers at any angle and sleeve couplers end to end.
- Cuplokكب لوك (Cuplok)
- A system scaffold whose ledgers lock into cups fixed on the standards.
D
- Debris netting and sheetingشبك الحماية والأغطية
- Net or sheet fixed to the face of the scaffold to catch debris. It adds wind load, so the scaffold must be designed for it.
F
- Full-body harnessحزام الأمان الكامل
- A harness worn around the body and legs that holds a person in a fall when connected to an anchor.
G
- Gin wheelبكرة الرفع
- A pulley fixed to the scaffold for lifting light materials by rope.See also: Scaffold calculators
- Guardrailالدرابزين
- The top rail along the open edge of a platform that stops people falling. Its height follows your client's rules.See also: Guardrail height compared
H
- Handoverالتسليم
- The point where the scaffold contractor passes a complete, inspected scaffold to the user, usually with a signed handover certificate.
- Hanging (suspended) scaffoldالسقالة المعلقة
- A scaffold hung from the structure above, for example under a pipe rack or a bridge.See also: Inspection checklists
- Hop-up bracketكتيفة الامتداد
- A bracket fixed to the standards that carries a narrow extra platform on the inside, closer to the wall.
I
- Independent tied scaffoldالسقالة المستقلة المربوطة
- Two rows of standards joined by ledgers and transoms, standing on its own base and tied to the structure.See also: Inspection checklists
- Inspectionالفحص
- A check by a competent person before first use, at set intervals (often every 7 days) and after any change, storm or incident. Your client's rule sets the interval.See also: Inspection frequency compared
J
- Joint pinالمسمار الداخلي للوصل
- A fitting inside the tube that joins two tubes end to end. It does not hold the tubes against pulling apart, so a sleeve coupler is used where the joint may be pulled.
K
- Kicker liftالمنسوب السفلي
- A low first lift of ledgers and transoms near the base that helps keep the standards in position.
- Kwikstageكويك ستيج (Kwikstage)
- A system scaffold with V-pressings on the standards that take wedge-ended ledgers and transoms.
L
- Ladder accessالوصول بالسلم
- A ladder fixed to the scaffold to reach a platform, tied at the top, rising above the landing for a handhold, with a self-closing gate at the top.
- Ledger (runner)المدّاد (الرانر)
- A horizontal tube along the length of the scaffold that joins the standards at each lift. Also called a runner.
- Liftالمنسوب
- The vertical distance between two levels of ledgers; also one boarded level of the scaffold.
- Load class (duty)فئة الحمل
- The working load a platform is designed for, such as light, medium or heavy duty. Never load beyond the class written on the tag.See also: Load classes compared
- Loading bayمنصة التحميل
- A bay built to land and store materials on the scaffold, designed for the heavier load.See also: Inspection checklists
M
- Mid railالدرابزين الأوسط
- A second rail between the guardrail and the toe board that closes the gap below the top rail.
- Mobile towerالبرج المتحرك
- A free-standing tower on castors that is moved between jobs. The castors are locked before anyone climbs.See also: Inspection checklists
O
- Outriggerالذراع الخارجي
- An arm fixed at the base of a tower that widens its base and makes it more stable.
P
- Permit to workتصريح العمل
- A written permit from the plant or site owner that lets a job start in a set area under set controls.
- Plumbالشاقول
- Truly vertical. Standards are set plumb and checked with a level.
- Putlog couplerكلبس البوتلوج
- A single coupler that fixes a transom or a putlog to a ledger.
- Putlog scaffoldسقالة البوتلوج
- A single row of standards with putlogs whose flattened ends rest in the wall being built.
R
- Rakerالدعامة المائلة الخارجية (الرايكر)
- An inclined tube from the ground to the scaffold that props it where ties cannot be fixed.
- Ringlockرنغ لوك (Ringlock)
- A system scaffold whose standards carry rosettes at set distances; ledgers and braces wedge into the rosettes.
S
- Safe working load (SWL)حمل العمل الآمن
- The most a part or a piece of lifting equipment may carry in normal use, as given by its maker or design.
- Scaffold boardلوح السقالة
- A timber or steel board that makes up the platform. Boards are checked for splits, rot and bends before use.
- Scaffold designتصميم السقالة
- Calculations and drawings for a scaffold outside the standard configurations, prepared by a competent designer.
- Scaffold inspectorمفتش السقالات
- The person who inspects scaffolds and records the result on the tag and in the register.
- Scaffold supervisorمشرف السقالات
- The person who directs the crew that erects, alters and dismantles scaffolds, and checks their work.
- Scaffold tagبطاقة السقالة
- The card at each access point that says whether the scaffold may be used: green safe for use, yellow use with the restriction written on it, red do not use.See also: Tag colours
- Self-retracting lifeline (SRL)حبل النجاة ذاتي الارتداد
- A fall arrester whose line pulls out and rewinds as you move, and locks in a fall to limit the free fall.
- Sole boardلوح الارتكاز
- A timber board or plate under the base plates that spreads the load over the ground.
- Stair towerبرج السلالم
- A tower with flights of stairs and landings that gives safer access than ladders, with handrails on each flight.
- Standardالقائم
- A vertical tube that carries the scaffold's load down to the base.
- System scaffoldالسقالة النظامية
- A scaffold built from factory-made parts that lock together instead of loose tubes and couplers. It is built to the maker's instructions.
T
- Tag holderحامل البطاقة
- The holder fixed at each access point that carries the tag. An empty holder means the scaffold is not ready for use.See also: Tag colours
- Temporary worksالأعمال المؤقتة
- Structures used to build the permanent works, such as scaffolds, falsework and propping, managed so each is designed, checked and signed before use.
- Tieربطة التثبيت
- A fixing that holds the scaffold to the building or structure so it cannot move towards or away from it: through, box, lip, reveal and anchor ties.See also: Tie spacing compared
- Toe boardلوح القدم
- A board on edge along the open edge of a platform that stops tools and materials falling off.
- Transom (bearer)العارضة (البيرر)
- A short horizontal tube across the width of the scaffold that carries the boards. Also called a bearer.
- Tube and coupler (tube and fitting)الأنابيب والكلبسات
- A scaffold built from loose steel tubes, 48.3 mm outside diameter, joined with couplers.See also: Scaffold calculators
W
- Working platformمنصة العمل
- The boarded level people work from, with guardrails and toe boards on every open side.See also: Load classes compared
No word matches. Try a shorter word.
Plain definitions for site use. Sizes, spacings and inspection intervals follow your client's rules and the scaffold design: check the current edition of the standard your site works to.
Words into practice
One checklist for each scaffold type, the tag colours, and a scaffold question a day.