No scaffold with a late inspection.
Inspect your scaffold and print its tag with a QR code in a minute. The client's inspector reads it on his phone.
Free for individuals: inspections, tags and your cards. For companies: site, stores and office.
The demo with sample data opens once your email is confirmed. Create a free account or sign in, then enter the 6-digit code we email you.
Confirm your email to open the app. Sign in below: we email a 6-digit code to your address. Your records stay on this phone.
This phone already has records
Your account has a cloud backup from . Choose which records to keep on this phone.
The free places are taken
The first 50 users use the app free. Join the waitlist with the details below and we email you when a place opens.
You can correct your details or ask to close your account in About.
Updated terms
From 29 October 2026, AL-YASSIN keeps a copy of what you save in the app to run and improve it. If you do not agree, ask to close your account in About › Privacy and your data.
Measure it, inspect it, tag it.
Take-offs, 7-day inspections and a tag register in your pocket, backed up to AL-YASSIN whenever you are online.
Turn on alerts
Get a notice on this phone for scaffolds overdue or due today and for late designs.
AL-YASSIN Scaffold Consulting™ · v4.49.0
Measure the scaffold
View-only account: you see the company records but cannot change them.
Photos stay on this phone until you sign in.
Take-off sheet
Measurement rule: agree in the contract what counts as length, width and height, plus minimum charges and extra-over items, before work starts. This tool only multiplies what you enter. Rates are yours.
Inspect and tag
View-only account: you see the company records but cannot change them.
Photos stay on this phone until you sign in.
Detailed checklist Optional
Use your site's tag system. The checklist follows the standard set for the project: the client's CSM / GI 8.001 or NASC TG20. Check the latest editions and the scaffold design or compliance sheet. A competent person signs the tag.
Tag register
Next due = last inspection + the tag validity of its project or client (7 days if none is set). Tags due within the warning days (2 by default) are marked Due soon. Add to calendar saves a reminder (.ics) for 07:00 on the due date, with an alert the day before. Re-inspect sooner after any alteration or adverse weather. The register is kept on this phone and backed up to AL-YASSIN when you are online.
The work stopped. The clock didn't.
Late or failed scaffolds leave paid crews standing. Enter your own figures.
Formula: crew × SAR per man-hour × hours lost per delay × delays per month. Starting values are examples only.
Numbers for the morning brief
Tube weight · BS EN 39, 48.3 × 4.0 mm
| Stock length | Imperial | Approx. weight |
|---|
A 6 m tube is about 26 kg. Plan lifting and the handling chain under SG6 (manual handling) and SG9 / LOLER for mechanical lifts. Don't leave it to the crew on the day.
Platform & edge protection
| Main guardrail height | ≥ 950 mm |
| Max. unprotected gap between rails | ≤ 470 mm |
| Toe board height | ≥ 150 mm |
| Board overhang past transom | 50 mm – 4 × t |
| Ladder angle | 75° (1 in 4) |
| Ladder above landing | ≈ 1.05 m |
Board span · BS 2482 timber boards
| Board thickness | Max. transom span |
|---|---|
| 38 mm | 1.2 m |
| 50 mm | 2.6 m |
| 63 mm | 3.25 m |
Overhang for a 38 mm board: 50–150 mm. Never lap boards on a working platform without a design.
Load classes · BS EN 12811-1
| Class | Uniform load | Typical use |
|---|---|---|
| 1 | 0.75 kN/m² | Inspection, very light work |
| 2 | 1.50 kN/m² | Light duty, no material storage |
| 3 | 2.00 kN/m² | General purpose |
| 4 | 3.00 kN/m² | Heavy duty |
| 5 | 4.50 kN/m² | Masonry / heavy materials |
| 6 | 6.00 kN/m² | Special duty, by design |
The load class goes on the tag. Anything stacked above it needs a design.
When to inspect
| Before first use / handover | Always |
| Routine | ≤ 7 days |
| After alteration, damage or adverse weather | Before use |
| Record | Tag + register + report |
Typical fitting weights
| Item | Approx. |
|---|---|
| Right-angle (double) coupler | 1.0 – 1.3 kg |
| Swivel coupler | 1.2 – 1.5 kg |
| Putlog (single) coupler | 0.6 – 0.7 kg |
| Sleeve coupler | 1.0 – 1.2 kg |
| Timber board 3.9 m (13 ft) | ≈ 20 kg |
Varies by maker and moisture. Use the supplier's data sheet for lifting plans.
Verify against the latest editions of TG20, BS EN 12811-1, BS 2482 and the client's site rules (e.g. CSM). Where they differ, the stricter rule and the scaffold design govern.
Tell us what interests you
Everything on AL-YASSIN is free today: exams, tools and guidance, with no paid work and no payments. Advisory and training services for contractors are in preparation. Join the priority list and you will hear first. No fees, no payment, no obligation.
Nothing is charged and no payment details will be sent. Your reference
What good practice covers
Ten areas of expertise in three groups. Tap any area for what good practice produces. Everything on AL-YASSIN is free today.
Company profile (PDF)Areas of expertise, approvals and standards · opens in Google DriveEverything on AL-YASSIN is free today: no paid work, no payments.
Projects and sites
Group tags and take-off lines by project or site. Each project shows its scaffolds, tag colours, due dates and quantities.
New inspections and take-off lines go into this project. You can change the project on each form.
Clients and tag validity
Each client or facility has its own tag system. Set how many days a tag stays valid; 7 days is the default. Verify against the client's current site rules.
A new rule applies from the next inspection; tags already in the register keep their due date until re-inspected. Re-inspect sooner after any alteration or adverse weather, whatever the interval.
Projects are kept on this phone. Removing a project keeps its tags and take-off lines; they move to No project.
Replies
Replies and feedback from AL-YASSIN. You also get each reply by email.
+ Join the priority listChange log
Every addition, edit and deletion in your company, with who made it and the date and time.
About and settings
Your work
This app
AL-YASSIN
AL-YASSIN Scaffold Tools · app 4.49.0
Scaffold expertise, on your side.
Alerts on this phone
Off
On iPhone: tap Share › Add to Home Screen, open the app from the new icon, then turn alerts on here.
An independent scaffolding and temporary works knowledge platform: free exams, verifiable certificates, field tools and good-practice guidance. Free today: no paid work, no payments. Contractor services in preparation: join the priority list.
My profile
Urdu, Hindi, Tagalog, Bengali and Nepali are draft translations of the worker screens. Other screens, reports and PDFs stay in English.
Free tools for trainers, plant owners and job seekers
Exam room: a trainer opens a room, the class answers on their phones and the results come back live. Plant owner board: one screen for the tags of every contractor that shares a client page with you.
Data safety
Phone storage is almost full. Save a backup file and remove old photos.
With a password the file is encrypted: nobody can read it without the password, and it cannot be recovered if you forget it.
Restoring from a file is not available in a company account. The company server holds those records.
The file holds your own records on this phone, including crew details if you added any, so keep it private. Signatures still waiting to send are not in it.
Account & cloud backup
Sign in with your email to keep a cloud backup of your tag register, projects and take-off, and to use them on another phone.
Company account
Backup & sync
Everything you save (profile, take-offs, cost figures, inspections, tag register and interest notes) is sent to AL-YASSIN as soon as you have signal.
Excel
One Excel file with a tab for each part your role can see: tags, inspections, take-off, projects, clients, requests, crew and cards, material movements, stock, lifting equipment and supplier hire.
Improvement copy
A copy of everything you save goes to AL-YASSIN to run and improve the app. It is part of the terms you agreed to. To stop it, ask to close your account below.
Privacy
No ads and no third-party trackers. Your profile and everything you save are sent to AL-YASSIN Scaffold Consulting and kept on this phone, so we can run the service and reply to your requests. Full privacy policy
Close my account
AL-YASSIN Scaffold Consulting™ · AL-YASSIN Scaffold Tools v4.49.0 · Dubai, UAE
Scaffolds
Site
Stores
Office
Life of this scaffold
People and permissions
Each person's role and access. A change reaches the person's phone at its next sync.
Process map
How this build works, drawn from the app's own code. Hubs, roles and the request steps are read live; the other charts are checked against the code every time you open this page.
Account control
Everyone who signed up in the app. Change an account's access, set the trial end, hide screens or leave a notice. A change reaches the person's phone within a minute.
Invitation figures
Open to load the figures.