Getting the scaffold right on paper, proving it is right on site, and keeping the cost under control: pick the service, the role you work in, or the way you want to engage us.

Consulting services

Right on paper. Right on site.

Getting the scaffold right on paper, proving it is right on site, and making sure it is paid for once, at the right rate. Approvals and audit readiness follow below.

SERVICE 01 · ENGINEERING & ASSURANCE

Scaffold design & engineering

Layouts, calculations and compliance checks for everything from a single tower to birdcages, cantilevers, loading bays and suspended scaffolds.

  • TG20 / TG30 compliance sheets
  • Layout drawings and sections
  • Load, tie and base calculations
  • Design checks on third-party designs
SERVICE 02 · ENGINEERING & ASSURANCE

Temporary works coordination

Scaffolding managed as temporary works under a BS 5975 procedure, with clear briefs, independent checks and permits at every stage.

  • Temporary works procedure and register
  • Design briefs
  • Design check certificates
  • Permit to load and permit to strike
SERVICE 03 · ENGINEERING & ASSURANCE

Inspection & independent audit

Handover, periodic and pre-shutdown audits against TG20, TG30, SG4 and your site rules, with photographs and a prioritised action list.

  • Audit report with photographs
  • Defect and close-out list
  • Tag and register review
  • Readiness sign-off before shutdowns
SERVICE 04 · ENGINEERING & ASSURANCE

Training & competency

Scaffolding awareness for client-side engineers, supervisors and HSE teams, and competency checks for the crews who build and inspect.

  • Client-side scaffolding course
  • Inspection and tagging briefings
  • Toolbox talks
  • Card and competency verification
SERVICE 05 · COST, PLANNING & CONTROL

Commercial & cost control

Measurement rules, quantity checks and contract advice for owners and contractors, on live jobs and at final account.

  • Measurement rules (m³ · m² · lm)
  • Invoice and quantity audits
  • Variation and claim support
  • Rental versus ownership analysis
SERVICE 06 · COST, PLANNING & CONTROL

Estimation & access planning

Quantities, manpower norms and access plans tied to the construction or shutdown programme, so access is ready before the trades arrive.

  • Take-offs and bills of quantities
  • Crew sizing and productivity norms
  • Shutdown and turnaround access plans
  • Pre-staging schedules
SERVICE 07 · COST, PLANNING & CONTROL

Material & yard control

Yard layout and a GRN-to-return control loop that keeps stock accurate, utilisation visible and hire charges honest.

  • Yard layout and storage plan
  • GRN, issue and return procedures
  • Stock and utilisation reports
  • Loss and damage control
SERVICE 08 · COST, PLANNING & CONTROL

Tender & contractor management

Scopes, specifications and bid evaluation that make scaffolding contractors comparable, then hold them to the plan.

  • Scope of work and specification
  • BOQ and pricing schedule
  • Technical and commercial bid evaluation
  • KPI and performance reviews

Built for your role

What changes for you

Everyone on the project needs something different from scaffolding. Pick your role.

What we hear

My trades are standing around because the access isn't ready or failed inspection.

What we do about it
  • ✓Access plan tied to your look-ahead programme
  • ✓Crew sizing and pre-staging so access is ready before trades arrive
  • ✓Contractor KPIs and the scaffold register reviewed against the plan
  • ✓Shutdown access planned before the window opens
What you receive
Access plan & programmeAccess sequence, crew sizing and pre-staging tied to your dates.

The cost of waiting

The work stopped. The clock didn't.

Log the delays you actually had this month. The calculator prices the idle crew, adds the costs most people forget, and shows what the waiting does to your programme.

01 · Your crew
02 · Your delays this month, by cause
03 · Costs most people forget

Starting values are examples only. Use your own crew rates, delay log and contract terms.

Idle labour per month
0SAR
With overhead & plant0
Man-hours lost0
Average per delay0
Of working time0
Cumulative waiting cost · next 6 monthsSAR
If the time is not made up, the job slips0
Catching it up on overtime adds (premium only)0
Biggest leaks this month
What fixing it is worth

Up to 0 SAR of waiting avoided over 6 months. Your estimate, not a guarantee.

Share on LinkedIn

Where scaffolding leaks time and money

WhereWhat goes wrongWhat we put in place
1Submittals & designsRejected, so crews mobilise with nothing approved to buildSubmittals and designs built to the client's requirements and checked before issue
2MeasurementQuantities argued at invoice stageAgreed measurement rules, joint measurement and invoice audits
3HireRental still charged after the steel is backOff-hire on the return date, reconciled against the hire register
4MaterialLost and damaged stock no one can account forGRN-to-return control with joint counts and a loss and damage report
5Inspections & auditsRed tags, findings and stop-work ordersAudit readiness and independent audits against TG20 / TG30, SG4 and client rules
6AccessPaid trades waiting at the work frontAccess plan tied to the programme, with pre-staged material and crew sizing

Ways to work with us

Engage us the way your project needs

From a single audit or submittal to a full project appointment. Each engagement starts with a written scope and a fixed list of deliverables.

01

Project advisory

A consultant on call for your project, from tender through strip-out, reviewing designs, measurements and contractor performance.

BEST FORConstruction and EPC projects
02

Shutdown & TAR access

Access planning before the shutdown, audits during the window and reconciliation at the end.

BEST FORTurnarounds and planned outages
03

Independent audit

A site audit of scaffolds, registers and tagging, with a written report and a prioritised action list.

BEST FORHSE assurance and pre-shutdown checks
04

Design package

Designs and calculations for scaffolds outside TG20 or TG30 compliance, or a check of someone else's design.

BEST FORComplex, high or heavy-duty access
05

Commercial review

Measurement, invoice and claim review on live contracts or at final account.

BEST FORDisputes, final accounts and audits
06

Approval submittals

A submittal or pre-qualification pack built to a named client's requirements, with comments tracked to approval.

BEST FORNew client or new site approvals
07

Audit readiness

Gap assessment, evidence pack and a mock audit ahead of a client, third-party or internal audit.

BEST FORScheduled client and third-party audits
08

Training

Courses for client-side teams and briefings for site crews, run on your site or ours.

BEST FOROwner, EPC and HSE teams

Delivery support & digital tools

Advice first. Tools you can use today.

The tools we give clients are free on this site. When a project also needs material or crews, we arrange them to the same standard.

When you need hands on the tools

Delivery support

Advice comes first. Where a project also needs material, crews or inspection, we arrange them under the same standards and records.

  • Material supply & rentalBS EN 39 tube, BS EN 74 couplers, Ringlock, Cuplok, planks and boards, with certificates and joint counts.
  • Erection & dismantlingSupervised, carded crews that build to the drawing and hand over tagged.
  • Inspection & taggingHandover, 7-day and after-weather inspections with a live register.
  • Shutdown crewsPre-built access, day and night shifts in the window, fast strip-out.

Questions

Before you ask

Straight answers to what clients ask us most. Anything else, send us the scope, the drawings or the dispute.

A view from your side of the contract. We check that designs, measurements and hire charges are right for you, and give your team the knowledge to hold the contractor to the plan.

As early as the tender. Scope, specification and measurement rules set most of the scaffolding cost before the first tube arrives. We also step in mid-project for audits, disputes and shutdown planning.

By the unit agreed in the contract: m³ for access and birdcage volumes, m² for faces and decks, and linear metres for handrails and edge protection, recorded on a sheet signed by both sides before it is invoiced.

Yes. Our procedures, inspection records and competency checks are set up for Aramco-regulated sites and their permit-to-work systems.

Yes. We review the client's requirements, find the gaps, build the submittal or evidence pack and run a mock audit before the real one. We track client comments to close-out; the approval decision stays with the client.

Yes. We run scaffolding awareness courses for client-side engineers, supervisors and HSE teams, and briefings for site crews on inspection and tagging. See the training page for the full course list.

The scope and location, drawings or photos, your programme dates and, for commercial questions, the contract or tender documents.

For inquiries

Send us the scope, the drawings or the dispute.

We come back with a clear plan, the numbers behind it and a fee proposal. Drawings, photos or the contract are enough to start.

Get the company profile
Emailsales@alyassinscaffold.com
OfficeDammam, Eastern Province, KSA
Watch the film