Bracket (tank builder’s) scaffold: inspection checklist
A scaffold carried on brackets hooked into straps welded to a tank or vessel wall. The 24 questions of Saudi Aramco SA Form 9617, then site records.
Inspection record
- Scaffold tag no.
- Scaffold description / location
- Platform width (m)
- Platform length (m)
- Inspected by (signature)
- Print name
- Certificate / badge no.
- Date (D/M/Y)
- Next inspection due
SA Form 9617. Bracket Scaffold Field Inspection Checklist, as used under Saudi Aramco GI 8.001. Tick Yes, No, or NA when the question does not apply to this scaffold.
General requirements
- 1Are all bracket scaffold components (including brackets, planks and ladders) free from detrimental corrosion, damage or other defects?
- 2Have all bracket straps been welded to the tank wall by Saudi Aramco certified welder(s)?
- 3Have the completed bracket strap welds to the tank wall been inspected and approved by a Saudi Aramco certified welding inspector?
- 4Are bracket straps at least 250 x 75 x 10 mm (10 x 3 x 3/8 in) in size?
- 5Do brackets fit inside the bracket strap gaps with not more than 3 mm (1/8 in) clearance at the front or back faces?
- 6Are brackets installed in a vertical and plumb position?
- 7Are the supports (bearers/board bearers) for 38 mm (1-1/2 in) wood planks not more than 1.5 m (5 ft) apart?
- 8Are the supports (bearers/board bearers) for 50 mm (2 in) wood planks not more than 2.4 m (8 ft) apart?
- 9Is a guardrail system (including toprails and midrails) installed along the outside edge of all platforms?
- 10Is a guardrail system provided along the inside edge of all platforms that are more than 360 mm (14 in) from the face of the tank?
- 11Are guardrails made from scaffold tubes or wire ropes at least 10 mm (3/8 in) in diameter?
- 12If toprails are scaffold tubes, are connections made only at support uprights (no mid-span end-to-end connections)?
- 13If wire rope guardrails are used, are they securely fixed and kept tight?
- 14Are toprails between 0.95 m and 1.15 m (38 to 45 in) above the platform walking/working surface?
- 15Are guardrail support uprights made of scaffold-grade tube or structural angle, welded or adequately secured to the brackets?
- 16If guardrail support uprights are not welded to the brackets, are their support sleeves at least 150 mm (6 in) high and welded in place?
- 17Is falling object protection provided (toeboards, barricades, wire screen, nets, etc.)?
- 18Is the working platform between 450 mm and 680 mm (18 to 27 in) wide and fully planked, with no gaps larger than 25 mm (1 in)?
- 19Are planks or platform units secured to the brackets to prevent movement?
- 20If plank ends are split, are cracks less than 300 mm (12 in) long when the end is banded, or less than 25 mm (1 in) when not banded?
- 21Are all wood scaffold planks at least 38 mm (1-1/2 in) thick and at least 225 mm (9 in) wide?
- 22For solid sawn wood planks, is a “Scaffold Grade” stamp from an accepted lumber grading/inspection association visible?
- 23For laminated veneer lumber (LVL) planks, are “Proof Tested Scaffold Plank” and “OSHA” continuously embossed along both edges?
- 24Are planks overlapped in one direction only, with a minimum overlap of 300 mm (12 in)?
Site & records
- 25Clear of hazardsOverhead power lines, hot surfaces, live lines and traffic as per the work permit
- 26Red tag holder at every access point with a signed green or yellow insertDate of next inspection written on the tag; valid for two weeks at most (GI 8.001)
- 27Scaffold plan available and accepted where requiredSpecial scaffolds need an engineering-reviewed plan (see GI 8.001, definition of special scaffold)
Any “No” on the form questions means the scaffold is not accepted: keep or fit the red tag, fix it, then inspect again. A yellow tag allows use only with a properly anchored full-body harness, and never allows an incomplete scaffold to be built on purpose.
Questions and limits follow the Saudi Aramco Bracket Scaffold Field Inspection Checklist (SA Form 9617, GI 8.001). Wording is shortened and every question is asked so that Yes = pass (a few on the printed form are asked the other way round). Independent training aid: not issued, endorsed or approved by Saudi Aramco, and it does not replace the official form, the scaffold tag or your permit. Verify against the latest GI 8.001 and Construction Safety Manual.
AL-YASSIN · alyassinscaffold.com/checklists/bracket-scaffold/ · Check the latest editions and the scaffold design.
Do it on your phone
The same checks in the free field app, with photos, the tag status and a PDF report. In the app, pick scaffold type: Independent tied.
Open in the free app