  1. 1
    Lift heights and bay lengths as the compliance sheetNo lift or bay bigger than the TG20 sheet or design shows
  2. 2
    Inside edge protected where people could fallInside guardrail or inside boards between the platform and the structure
  3. 3
    Sheeting or netting only where the design allows itSheeted scaffolds take much more wind; the ties must be designed for it
  4. 4
    Loading bays and bridges as designedBeams, bridging tubes and extra ties where the design shows them

Foundations

  1. 5
    Ground firm and level; base plates on sole boardsNo undermining, soft spots or water pooling
  2. 6
    Standards plumb; joints staggeredNo two adjacent joints in the same lift

Structure

  1. 7
    Ledgers level; joints staggeredJoints made with sleeve couplers or as designed
  2. 8
    Transoms at every standard and at spacing for the boardCheck board span for the thickness used
  3. 9
    Façade and ledger bracing completeAs TG20 compliance sheet or design
  4. 10
    Ties in place to the tie patternNone removed or altered without approval
  5. 11
    Couplers tight and correct typeRight-angle or swivel for load-bearing; none missing

Working platform

  1. 12
    Fully boarded; boards soundNo gaps, splits, rot or trip hazards; overhang 50 mm to 4 × thickness
  2. 13
    Guardrails completeMain rail ≥ 950 mm; gap between rails ≤ 470 mm
  3. 14
    Toe boards fitted and secure≥ 150 mm; brick guards or netting where materials are stored
  4. 15
    Not overloadedMaterials within the load class on the tag

Access

  1. 16
    Ladder secured at the right angleAbout 75°, extends ≈ 1 m above the landing
  2. 17
    Access openings protectedSelf-closing gate or equivalent; no climbing the frame

Site & records

  1. 18
    Clear of hazardsOverhead power lines, hot surfaces, live lines, traffic as per permit
  2. 19
    Tag fitted at every access pointStatus and load class match the register
  3. 20
    Design or compliance sheet availableFor any configuration outside standard guidance

Any “No” means the scaffold is not handed over: red tag it, fix it, then inspect again.

Based on TG20:21, TG30, SG35-style inspection practice, BS EN 12811-1 and the Saudi Aramco Construction Safety Manual. Not endorsed by any of them. Verify against the latest edition and the scaffold’s own design.

AL-YASSIN · alyassinscaffold.com/checklists/independent-tied-scaffold/ · Check the latest editions and the scaffold design.

Do it on your phone

The same checks in the free field app, with photos, the tag status and a PDF report. In the app, pick scaffold type: Independent tied.

Open in the free app

Other scaffold types

All checklists