At what point do you stop and ask for a design drawing?

AL-YASSIN team

The crew says “we have built this many times”. The job is a little different from the last one.

Answers

AL-YASSIN team

A scaffold outside the standard configurations your site works to needs a design. For tube and fitting under TG20:21 that is anything a compliance sheet does not cover. Which cases catch people out most?